Lower Thames Crossing will use the latest tunnelling tech to overcome difficult conditions

Digital Edition: Lower Thames Crossing will use the latest tunnelling tech to overcome difficult conditions

Tunnelling for the £9bn Lower Thames Crossing (LTC) will use the latest tunnelling technologies to overcome site, geological, water pressure and other constraints, the project’s tunnels technical director Keith Bowers told NCE.
SUBSCRIBE TODAY

You have read 1 of 1 free-access articles allowed for 30 - days. For further access please register or log in. ICE members can login for free using their ICE email address and password to gain access. If you need an alternative log in option, it can be found here

Already have an account, click here to sign in