Arcadis | New Civil Engineer https://www.newcivilengineer.com Civil engineering and construction news and jobs from New Civil Engineer Thu, 28 Mar 2024 17:49:15 +0000 en-GB hourly 1 https://wordpress.org/?v=6.0 https://emap-romulus-prod.s3.eu-west-1.amazonaws.com/wp-content/uploads/sites/9/2023/07/favicon-nce192x-70x70.png Arcadis | New Civil Engineer https://www.newcivilengineer.com 32 32 https://www.newcivilengineer.com/wp-content/themes/mbm-mops-2017/images/logo.gif New Civil Engineer https://www.newcivilengineer.com 125 75 Civil engineering and construction news and jobs from New Civil Engineer Canal and River Trust appoints Arcadis, RSK, Stantec and more as technical experts https://www.newcivilengineer.com/latest/canal-and-river-trust-appoints-arcadis-rsk-stantec-and-more-as-technical-experts-28-03-2024/ https://www.newcivilengineer.com/latest/canal-and-river-trust-appoints-arcadis-rsk-stantec-and-more-as-technical-experts-28-03-2024/#respond Thu, 28 Mar 2024 15:00:45 +0000 https://www.newcivilengineer.com/?p=276166 The Canal and River Trust has appointed Arcadis, RSK and Geotechnical Engineering to provide technical expertise on maintaining its assets amidst the “growing challenge of climate change-driven storms and floods”.

The post Canal and River Trust appoints Arcadis, RSK, Stantec and more as technical experts appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/canal-and-river-trust-appoints-arcadis-rsk-stantec-and-more-as-technical-experts-28-03-2024/feed/ 0
Revelation of 54% increase in English sewage spills prompts widespread outrage https://www.newcivilengineer.com/latest/revelation-of-54-increase-in-english-sewage-spills-prompts-widespread-outrage-27-03-2024/ https://www.newcivilengineer.com/latest/revelation-of-54-increase-in-english-sewage-spills-prompts-widespread-outrage-27-03-2024/#respond Wed, 27 Mar 2024 14:15:29 +0000 https://www.newcivilengineer.com/?p=276113 New Environment Agency data showing a significant increase in sewage spills in England during 2023 has been variously described as “unacceptable”, “squalid”, “outrageous” and “a shitshow”.

The post Revelation of 54% increase in English sewage spills prompts widespread outrage appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/revelation-of-54-increase-in-english-sewage-spills-prompts-widespread-outrage-27-03-2024/feed/ 0
New line between Handsacre and Manchester Airport proposed to replace HS2 Phase 2 https://www.newcivilengineer.com/latest/new-line-between-handsacre-and-manchester-airport-proposed-to-replace-hs2-phase-2-21-03-2024/ https://www.newcivilengineer.com/latest/new-line-between-handsacre-and-manchester-airport-proposed-to-replace-hs2-phase-2-21-03-2024/#comments Thu, 21 Mar 2024 13:34:58 +0000 https://www.newcivilengineer.com/?p=275860 A new rail link between Handsacre and Manchester Airport has been identified by the Greater Manchester and West Midlands mayors as their preferred option to replace High Speed 2 (HS2) Phase 2.

The post New line between Handsacre and Manchester Airport proposed to replace HS2 Phase 2 appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/new-line-between-handsacre-and-manchester-airport-proposed-to-replace-hs2-phase-2-21-03-2024/feed/ 2
HS2 | Sliding of 320m double composite deck for Westbury viaduct commences https://www.newcivilengineer.com/latest/hs2-sliding-of-320m-double-composite-deck-for-westbury-viaduct-commences-21-03-2024/ https://www.newcivilengineer.com/latest/hs2-sliding-of-320m-double-composite-deck-for-westbury-viaduct-commences-21-03-2024/#respond Thu, 21 Mar 2024 12:23:51 +0000 https://www.newcivilengineer.com/?p=275861 Engineers from EKFB (Eiffage Kier Ferrovial Bam JV) have commenced the sliding of the first section of the 320m double composite deck for High Speed 2’s (HS2’s) Westbury viaduct into position.

The post HS2 | Sliding of 320m double composite deck for Westbury viaduct commences appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/hs2-sliding-of-320m-double-composite-deck-for-westbury-viaduct-commences-21-03-2024/feed/ 0
Thames Water names consultancies to support Strategic Resource Options programme https://www.newcivilengineer.com/latest/thames-water-names-consultancies-to-support-strategic-resource-options-programme-21-03-2024/ https://www.newcivilengineer.com/latest/thames-water-names-consultancies-to-support-strategic-resource-options-programme-21-03-2024/#respond Thu, 21 Mar 2024 10:21:21 +0000 https://www.newcivilengineer.com/?p=275887 Arcadis, Jacobs Mott MacDonald JV and Turner & Townsend have been appointed to Thames Water’s £160M Programme Partner Framework.

The post Thames Water names consultancies to support Strategic Resource Options programme appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/thames-water-names-consultancies-to-support-strategic-resource-options-programme-21-03-2024/feed/ 0
Early proposals for $16bn tunnel in New York City take learnings from London tunnelling projects https://www.newcivilengineer.com/latest/early-proposals-for-16bn-tunnel-in-new-york-city-take-learnings-from-london-tunnelling-projects-13-03-2024/ https://www.newcivilengineer.com/latest/early-proposals-for-16bn-tunnel-in-new-york-city-take-learnings-from-london-tunnelling-projects-13-03-2024/#respond Wed, 13 Mar 2024 10:17:13 +0000 https://www.newcivilengineer.com/?p=275461 A key member of the newly formed project team set to build the $16bn (£13bn) Hudson Tunnel Project has said how early designs and plans for the scheme are taking learnings from similar tunnelling projects that have taken place in London and the UK.

The post Early proposals for $16bn tunnel in New York City take learnings from London tunnelling projects appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/early-proposals-for-16bn-tunnel-in-new-york-city-take-learnings-from-london-tunnelling-projects-13-03-2024/feed/ 0
Spring Budget 2024: Industry reacts to lack of infrastructure investment https://www.newcivilengineer.com/latest/spring-budget-2024-industry-reacts-to-lack-of-infrastructure-investment-06-03-2024/ https://www.newcivilengineer.com/latest/spring-budget-2024-industry-reacts-to-lack-of-infrastructure-investment-06-03-2024/#respond Wed, 06 Mar 2024 17:35:25 +0000 https://www.newcivilengineer.com/?p=275282 Chancellor Jeremy Hunt promised investments in advancing the UK's net zero efforts with nuclear and green energy in today's Spring Budget but future funding for transport and other vital infrastructure went amiss.

The post Spring Budget 2024: Industry reacts to lack of infrastructure investment appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/spring-budget-2024-industry-reacts-to-lack-of-infrastructure-investment-06-03-2024/feed/ 0
Climate advisors warn government UK’s decarbonisation ‘not on track’ https://www.newcivilengineer.com/latest/climate-advisors-warn-government-uks-decarbonisation-not-on-track-04-03-2024/ https://www.newcivilengineer.com/latest/climate-advisors-warn-government-uks-decarbonisation-not-on-track-04-03-2024/#respond Mon, 04 Mar 2024 16:01:07 +0000 https://www.newcivilengineer.com/?p=275160 The government has been warned not to carry over the surplus of greenhouse gas emissions reductions from the third carbon budget.

The post Climate advisors warn government UK’s decarbonisation ‘not on track’ appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/climate-advisors-warn-government-uks-decarbonisation-not-on-track-04-03-2024/feed/ 0
Mace, Parsons, Arcadis JV chosen as delivery partner for NYC $16bn Hudson Tunnel Project https://www.newcivilengineer.com/latest/mace-parsons-arcadis-jv-chosen-as-delivery-partner-for-nyc-16bn-hudson-tunnel-project-29-02-2024/ https://www.newcivilengineer.com/latest/mace-parsons-arcadis-jv-chosen-as-delivery-partner-for-nyc-16bn-hudson-tunnel-project-29-02-2024/#respond Thu, 29 Feb 2024 11:38:18 +0000 https://www.newcivilengineer.com/?p=275036 A joint venture consisting of Mace, Parsons and Arcadis has been selected as the delivery partner for New York City's $16bn (£13bn) Hudson Tunnel Project (HTP).

The post Mace, Parsons, Arcadis JV chosen as delivery partner for NYC $16bn Hudson Tunnel Project appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/mace-parsons-arcadis-jv-chosen-as-delivery-partner-for-nyc-16bn-hudson-tunnel-project-29-02-2024/feed/ 0
Consortium of Aecom and Arcadis appointed to tunnel and station design contract for Ontario metro https://www.newcivilengineer.com/latest/consortium-of-aecom-and-arcadis-appointed-to-tunnel-and-station-design-contract-for-ontario-metro-27-02-2024/ https://www.newcivilengineer.com/latest/consortium-of-aecom-and-arcadis-appointed-to-tunnel-and-station-design-contract-for-ontario-metro-27-02-2024/#respond Tue, 27 Feb 2024 11:56:11 +0000 https://www.newcivilengineer.com/?p=274922 A consortium consisting of Aecom and Arcadis has been appointed to design a new tunnel and the underground stations of the Ontario Line.

The post Consortium of Aecom and Arcadis appointed to tunnel and station design contract for Ontario metro appeared first on New Civil Engineer.

]]>
https://www.newcivilengineer.com/latest/consortium-of-aecom-and-arcadis-appointed-to-tunnel-and-station-design-contract-for-ontario-metro-27-02-2024/feed/ 0